Importing a schedule into a project sheet has always carried a hidden cost: someone has to go back through the results afterward and fix whatever the import got wrong — items grouped incorrectly, the same product scattered across areas as duplicate line items, placements that don't match the actual floor plan.
A firm should be able to trust that an import reflects the real structure of a project before that structure is locked into the project sheet, not after.
Schedule imports now surface product-and-component relationships and area matches for review before anything publishes. Rows are matched to the project's layers and areas, with suggestions and bulk actions available to correct anything grouped incorrectly. When the same product appears across multiple areas, it's consolidated into a single item with each placement and quantity preserved — instead of showing up as separate, disconnected rows.
The import flow also lets a team distinguish between same-named areas using area codes, create missing layers or areas as needed during import, leave a placement unassigned when appropriate, and review a final summary before publishing to the project sheet.
The goal isn't a faster import — it's an import a team can trust the first time.